2025 BMW M5 | 1,214 Miles | Run and Drive | VIN: WBS83FK03SCU77171
VIN WBS83FK03SCU77171
- VIN
- WBS83FK03SCU77171
- Year
- 2025
- Make
- BMW
2025 BMW M5 | 1,214 Miles | Run and Drive | VIN: WBS83FK03SCU77171
Final Bid: $87,750 USD
Auction: IAAI – Sold
Lot Number: 42596015
Sale Date: 01.07.2026
Year: 2025
Make & Model: BMW M5
VIN: WBS83FK03SCU77171
Condition: Run and Drive
Mileage: 1,214 miles
Engine: Not specified
Transmission: Not specified
Drive: Not specified
Fuel Type: Not specified
Body Color: Not specified
Keys: Not specified
Primary Damage: Minor Dents / Scratches
Secondary Damage: Not specified
Seller: Not specified
Documents: Not specified
Location: Chicago South, Illinois
Estimated Retail Value: Not specified
Estimated Repair Cost: Not specified
Notes:
This 2025 BMW M5 VIN WBS83FK03SCU77171 was sold through IAAI Chicago South under lot number 42596015. The vehicle was listed in Run and Drive condition with only 1,214 miles shown on the odometer. Reported damage was limited to minor dents and scratches. The final bid was $87,750 USD.












